تحقق من عروض الكريسماس الجديدة! مثالي لتخفيضات الكريسماس! تسوق الآن

Shopping Cart

0

Your shopping bag is empty

Go to the shop

Our Projects

We plan, supply and install complete fitness facilities across the UAE — from a single spare room to a full commercial training floor. This is how a project runs, and what we need from you at each stage.

The sectors we work in

Commercial

Clubs & studios

Full floors with zoning, phased delivery and AMC servicing.

Hospitality

Hotels & apartments

Low ceilings, noise limits and unsupervised use.

Corporate

Offices

Sized against headcount, installed outside working hours.

Education

Schools & sport

Safety-led specification and holiday installation.

Private

Home gyms

Sized to the room, delivered to the floor, assembled.

How a project runs

  1. Stage oneConsultationThe room, the users and the budget. We tell you what is realistic before anyone produces drawings. Book a consultation.
  2. Stage twoSurvey and planningMeasurements, access route, power and flooring conditions, then zoning and clearances. Planning & design.
  3. Stage three3D layout and approvalYou sign off the floor before anything is ordered. 3D layout.
  4. Stage fourEquipment scheduleLine by line against the approved plan, with options at different budget levels. Equipment selection.
  5. Stage fiveFlooring and installationFlooring first, then delivery to the room, assembly, levelling and testing. Installation.
  6. Stage sixHandover and aftercareWalkthrough, then scheduled servicing. Annual Maintenance Contracts.

Case studies

Individual project write-ups — photos, floor area, equipment schedule and timeline — are being prepared for this page. We would rather publish real projects with the client's agreement than fill the space with stock images.

If you want references relevant to your sector before committing, ask and we will share the most comparable completed work.

Common questions

What do you need from me to start?

Room dimensions, clear ceiling height, who will use it and how many at peak, plus a budget range. A drawing helps but is not essential. That is enough for a useful first conversation.

How long does a project take?

Planning and approval usually take one to two weeks once we have measurements. After that it depends on which items are in stock versus indent. You get a dated schedule with the quotation rather than a general estimate.

Can you work to our contractor's programme?

Yes. Send the programme and we will sequence flooring and equipment against it, flagging any lead times that put the date at risk early rather than late.

Do you work outside Dubai?

Across the Emirates, yes, with servicing UAE-wide. For GCC projects tell us the location and we will confirm what we can support before quoting.

Start a project

Send the floor area, the intended users and your target date. We will come back with a layout direction and an equipment budget.

Get in Touch with Us

Have questions? Chat with us on WhatsApp for instant support and personalized assistance.

Chat on WhatsApp